Each spring heavy load restrictions are in place to protect our highways and roads from damage from spring thaw conditions. The Ministry of Transportation advises of the dates the half load limits come in effect. The restriction usually begins in March and lifts at the end of May; however, the dates vary depending on the weather conditions.
You will notice the signs posted on the affected roads in the City of Kenora as listed in City of Kenora By-law 134-2021:
- Anderson Road
- Austin Lake Road
- Bayridge Road
- Beauty Bay Road
- Beggs Road
- Beryl Winder Road
- Bodgen Road
- Bruckenburger Road
- Carlton Road
- Coker Road
- Dennis Street
- Devlin Drive
- Duffus Road
- East Melick Road
- Essex Road
- Gauthier Road
- Gay Street
- Gould Road
- Haney Drive
- Hilly Lake Road
- Homestake Road
- James Road
- Johnson Road
- Jones Road (from Hwy 17E to Homestake Road)
- Kinger Road
- Kitt Road
- Lawton Drive
- Mark's Lane
- Matheson Bay Road
- Miller Rapids Road
- Mt. Evergreen Road
- McKenzie Portage Road
- Parameter Road
- Peterson Road
- Rabbit Lake Road
- Radcliffe Drive
- Rat Portage Road
- Ricky Street
- Ritchie Road
- Schnarr Lake Road
- School Road
- Sinclair Road
- Snow Drive
- Strecker Road
- Sunnyside Road
- Tallieu Road
- Tetroe Road
- Transmitter Road
- Treadway Road
- Villeneuve Road
- Villeneuve Road North
- Villeneuve Road South
- West Bay Road
- Whitehead Road
- Worona Road
- Zimmerman Road
Contact Us