Print Friendly

Public Docking

docking-main

Looking for boat docking or launching?

There are many City owned locations to dock or launch a boat to access the Lake of the Woods and Winnipeg River.  The Docks and Anchorage by-law 49-2016 sets out the regulations for each of the City owned access points with specific conditions for each such as docking time limit, areas requiring a permit, and prohibited use.  Signage clearly indicating the specifications have been posted at these locations and enforcement will monitor to ensure there is appropriate usage.

Seasonal Docking Fees and Rates
Keewatin $ 750.00
Harbourfront Dock “A” $ 750.00
Water Street $ 575.00
Coney Island
(available to owners of interior Coney Island lots only)
$ 575.00
Mooring Balls
(based on a maximum 72 hour period per each mooring buoy)
$ 20.00 / day

City Docks and Launching Ramps Public Use Permitted for Boating Purposes

7th Street South

Specific Conditions
No mooring permitted except for the purposes of loading and unloading of passengers, cargo and other material for a maximum of fifteen (15) minutes in the loading and unloading zone identified by authorized sign.
schedulea_7thstreets

Anicinabe Park Boat Launch

Specific Conditions
No mooring permitted except for the purposes of loading and unloading of passengers, cargo and other material for a maximum of fifteen (15) minutes in the loading and unloading zone identified by authorized sign.

Launching from the launching ramp and the use of the launching ramp to remove a boat from the water is permitted for a maximum of fifteen minutes.
schedulea_anicinabeparkboatlaunch2

Bay Road

Specific Conditions
No mooring permitted except for the purposes of loading and unloading of passengers, cargo and other material for a maximum of fifteen (15) minutes in the loading and unloading zone identified by authorized sign.

Launching from the launching ramp and the use of the launching ramp to remove a boat from the water is permitted for a maximum of fifteen (15) minutes.
schedulea_bayroad

Coney Island Beach

Specific Conditions
No mooring permitted except for the purposes of loading and unloading of passengers, cargo and other material for a maximum of fifteen (15) minutes in the loading and unloading zone identified by authorized sign.
schedulea_coneyislandbeach

Harbourfront – Dock B

Specific Conditions
Mooring to Dock B is permitted for a maximum of four (4) hours in the areas identified by authorized sign.

Where a boat has been moored to Dock B, no person shall moor such boat to a dock at this location again for at least one hour following the removal of the boat from the dock.
scheduleaandb_harbourfront

Keewatin Arena – Dock E

Specific Conditions
Mooring is permitted to Dock E for a maximum of four (4) hours.

Where a boat has been moored to Dock E, no person shall moor such boat to a dock at this location for at least one hour following the removal of the boat from the dock.

Keewatin Arena – Dock F

Specific Conditions
No mooring permitted to Dock F except for the purposes of loading and unloading of passengers, cargo and other material for a maximum of fifteen (15) minutes in the loading and unloading zone identified by authorized sign.

Launching from the launching ramp and the use of the launching ramp to remove a boat from the water is permitted for a maximum of fifteen (15) minutes.
scheduleaandb_keewatinarena

Keewatin Wharf – Dock A

Specific Conditions
Mooring to Dock A is permitted for a maximum of four (4) hours in the areas identified by authorized sign.

Where a boat has been moored to Dock A, no person shall moor such boat to a dock at this location for at least one hour following the removal of the boat from the dock.

Keewatin Wharf – Dock B (west side only)

Specific Conditions
Mooring to Dock B is permitted for a maximum of four (4)  hours in the areas identified by authorized sign.

Where a boat has been moored to Dock A, no person shall moor such boat to a dock at this location for at least one hour following the removal of the boat from the dock.

EAST side of Dock B is leased space only.
scheduleaandb_keewatinwharf

Kenora Recreation Centre

Specific Conditions
No mooring permitted except for the purposes of loading and unloading of passengers, cargo and other material for a maximum of fifteen (15) minutes in the loading and unloading zone identified by authorized sign.

Launching from the launching ramp and the use of the launching ramp to remove a boat from the water is permitted for a maximum of fifteen (15) minutes.
schedulea_kenorarecreationcentre

Matheson Street South

Specific Conditions
Mooring is permitted to the docks at this location for a maximum of four (4) hours.

No person shall moor such boat to a dock at this location again for at least one hour following the removal of the boat from the dock.
schedulea_mathesonstreetsouth

Main Street South

Specific Conditions
Mooring is permitted to the docks at this location for a maximum of four (4)  hours.

No person shall moor such boat to a dock at this location again for at least one hour following the removal of the boat from the dock.
schedulea_mainstreetsouth

Discovery Centre

Specific Conditions
Mooring is permitted to the docks at this location for a maximum of four (4) hours.

No person shall moor such boat to a dock at this location for at least one hour following the removal of the boat from the dock.
schedulea_discoverycentre

Winnipeg River Boat Launch

Specific Conditions
No mooring permitted except for the purposes of loading and unloading of passengers, cargo and other material for a maximum of fifteen (15) minutes in the loading and unloading zone identified by authorized sign.

Launching from the launching ramp and the use of the launching ramp to remove a boat from the water is permitted for a maximum of fifteen (15) minutes.
schedulea_winnipegriverboatlaunch

City Docks Where Public Use is Only Permitted with a Permit

Permits can be obtained at City Hall, with the exception of Anicinabe Docks.  Please visit the Anicinabe Park office for permits to dock at Anicinabe Park West and East.

Coney Island North

scheduleb_coneyislandnorth

Harbourfront – Dock A

scheduleaandb_harbourfront

Keewatin Arena – Dock A, B, C and D

scheduleaandb_keewatinarena

Keewatin Wharf – Dock B (East Side only)

Keewatin Wharf – Dock C

scheduleaandb_keewatinwharf

Water Street

scheduleb_waterstreet

Anicinabe Park West

Permits obtained from Anicinabe Park Office
scheduleb_anicinabeparkwest

Anicinabe Park East

Permits obtained from Anicinabe Park Office
scheduleb_anicinabeparkeast

City Mooring Buoys Where Public Use is Only Permitted with a Permit

Harbourfront Mooring Buoys

Permits obtained at City Hall.
schedulec_harbourfrontmooringbuoys

City Docks Where Public Use for Mooring, Launching and Other Boating and Boating Related Purposes is Specifically Prohibited

Keewatin Beach

All mooring, docking, launching prohibited.
scheduled_keewatinbeach

Water Treatment Plant

All mooring, docking, launching prohibited.
scheduled_watertreatmentplant

Anicinabe Park Beach

All mooring, docking, launching prohibited.
scheduled_anicinabeparkbeach

Refer to the Docks and Anchorage by-law 49-2016 for further related conditions and enforcement provisions.