Road Work on Ninth Street North and Houghton Road

Please be advised beginning Monday, September 11, 2017 and continuing through the week, road work is taking place on Ninth Street North and Houghton Road. There may be times during the day when traffic will be reduced to one lane in that area. Motorists should consider alternative routes when possible.

The City thanks motorists for their cooperation and patience during this infrastructure improvement project.

Bridge Lane Closures

Please be advised maintenance works will be performed on the following bridges from Wednesday, September 6 to Friday, September 8, with the bridge location varying by day, from 6:00 to 8:00 a.m. and 6:30 to 9:00 p.m.

Expect delays during these periods as the bridge will be down to one lane.

  • Darlington Bay
  • Matheson Street
  • Parson Street
  • Winnipeg River East Branch

Thank you for your patience and cooperation during the lane closures.

Bridge Maintenance Works

Please be advised maintenance works will be performed on the following bridges from Tuesday August 22 to Saturday August 26, with the bridge location varying by day, from 5:30 am to 8:00 am and 6:30 pm to 9:30 pm. Expect delays during these periods as the bridge will be down to one lane.

• Cameron Bay
• Darlington Bay
• Eighth Avenue South
• First Avenue South
• Matheson Street
• Parson Street
• Portage Bay
• Portage Bay Walk Bridge
• Winnipeg River East Branch
• Winnipeg River West Branch

August Road Rehabilitation

Please be advised during the month of August road rehabilitation work will be carried out on the following roads or road sections:

  • Homestake Road
  • Gould Road
  • 600-900 block of Anderson Branch Road
  • East Melick Road & Essex Road intersection

Motorists are advised that some sections of these roads will be limited to single lane traffic during construction.

The City thanks motorists for their cooperation and patience during this essential work.

Fourth Street North and Main Street North Closure Extended

Please be advised that the roadway between 100 block of Fourth Street North and 400 block Main Street North will be closed once again Thursday May 4th from 9 a.m. until 3:30 p.m. to complete the demolition/construction work. Motorists are advised to continue using alternate routes.  Local traffic will be allowed through the area however delays can be expected.

The City thanks motorists for their patience during this project.

Fourth Street North and Main Street North Road Closure

Please be advised that the roadway between 100 block of Fourth Street North and 400 block of Main Street North will be closed Wednesday May 3rd from 9 a.m. until 3:30 p.m. for road side demolition/construction work. Motorists are advised to use alternate routes. Local traffic will be allowed through the area however delays can be expected.

The City thanks motorists for their patience during this road construction.

4thStN_MainStN_Closure