Re-Surfacing Work on Rural Roads

Re-surfacing on Various Roads Starting September 25, 2019

Please be advised that re-surfacing work will begin on Wednesday, September 25th on the following rural roads:

• Essex Road (Hooterville stretch)
• East Mellick Road
• Murphy Drive
• Peterson Drive
• Keewatin Boat Lift Road
• Kerr Drive
• Anderson Branch Road

Motorists are reminded to slow down and take care when passing through construction zones. There may be dusty conditions and brief traffic delays. Please use alternate travel routes when possible.

The City extends thanks to motorists for their patience during this road work.