Winnipeg River West Branch Bridge Traffic Flow

Please be advised beginning Wednesday, May 8, 2019, RJ Concrete will begin bridge maintenance work on Winnipeg River West Branch Bridge (hospital bridge) for the next 3 – 4 weeks.

Two-way traffic should flow as usual; however, there will be a lane shift creating two narrow lanes of traffic over the bridge.

Motorists are asked to slow down and take care when driving through the narrow lanes.

The City thanks the public for their patience as this maintenance work is completed.