Bridge Maintenance July 17 – 21, 2017

Please be advised maintenance works will be performed on the following bridges during the week of Monday July 17 to Friday July 21, with the bridge location varying by day, from 5 to 7:30 a.m. and 7 to 9 p.m. Expect delays during these periods as the bridge will be down to one lane.

Cameron Bay
Darlington Bay
Eighth Ave South
First Ave South
Keewatin Channel
Matheson Street
Parson Street
Portage Bay
Winnipeg River East Branch
Winnipeg River West Branch

The Portier Bridge on the East Mellick Road will have maintenance performed on it during day time hours for the July 17 to July 21 period.